Oxygen Updates
H&S
upgraded the complete O2 system for a major steel plant in Kentucky.
This project was completed during a plant shutdown that required
coordination and planning. H&S III Inc. fabricated and
installed over 300 linear feat of 14" and 16" piping within the
confines of a 72 hour shutdown.
info@hs3inc.com
19564 Pleasant View Dr.
Abingdon, VA 24211
Office: 276.623.8393
Fax: 276.628.8786
|