Projects
Current Projects
-800 TPD Oxygen Plant
-Relocation of Two Gaseous Nitrogen Plants
-Dismantle of a 150M GAN Plant
-Relocation, Construction and Startup of 150M GAN Plant
-Relocation and Construction of a 70M GAN Plant
-Design and Installation of Catwalk, Ladders, and Guardrails at a local chemical plant
Recent Projects
-Relocation Construction and Startup of 150 GAN Plant
-Relocation and Construction of a 70M GAN Plant
-Oxygen Upgrades
-Installation of a High Pressure Nitrogen Plant
-Stacker Installation
Current Projects
800 TPD Oxygen Plant
H&S III Inc. is currently doing the project management, engineering procurement, and construction management for a gold mine in Eastern Europe. Our duties include writing of all specifications for construction, equipment refurbishment, new equipment, control systems, and startup and operating guidelines. Our engineering staff is designing foundations, mechanical equipment and piping, control systems process, and instrumentation. Our transportation staff is arranging all shipping of the entire plant from the United States to Eastern Europe.
Relocation of 2 GAN Plants
H&S III Inc. is currently dismantling, match marking and shipping a 130M and 70M plant from the Northeast United States to Canada.
Dismantle of a 150M GAN Plant
H & S III Inc. is currently dismantling, match-marking and storing at our facility a GAN plant for a major industrial gas company.
Design and Construction of catwalk, guardrails and ladders.
click here to see a 3 dimensional rendering produced by our CAD Design team.
Recent Projects
Dismantle of a 150M GAN Plant
H & S III Inc. is currently dismantling, match-marking and storing at our facility a GAN plant for a major industrial gas company.
Relocation and Construction of a 70m GAN Plant
This plant was dismantled in the Western United States and relocated to the Eastern United States.
Oxygen Updates
H&S upgraded the complete O2 system for a major steel plant in Kentucky. This project was completed during a plant shutdown that required coordination and planning. H&S III Inc. fabricated and installed over 300 linear feat of 14" and 16" piping within the confines of a 72 hour shutdown.